Feeder Overcurrent Protection 50/51

50/51 Phase & Earth Fault

0/7 steps ยท 0%

Mission Brief

The Assignment

It's 7:30 AM at the FortisBC Kelowna South substation. Your supervisor hands you a commissioning package for Bay 5 โ€” a new 13.8 kV feeder to a commercial complex. Your job: set the ABB REF615, wire up the CMC 356, run the secondary injection tests, and sign off before the energization crew arrives at noon.

  • Derive the correct relay settings from the protection study data
  • Configure the ABB REF615 virtual relay
  • Set up the Omicron CMC 356 test equipment
  • Run pickup and timing tests to IEC 60255-151 tolerance
  • Record and verify all test results