Mission Brief
The Assignment
It's 7:30 AM at the FortisBC Kelowna South substation. Your supervisor hands you a commissioning package for Bay 5 โ a new 13.8 kV feeder to a commercial complex. Your job: set the ABB REF615, wire up the CMC 356, run the secondary injection tests, and sign off before the energization crew arrives at noon.
- Derive the correct relay settings from the protection study data
- Configure the ABB REF615 virtual relay
- Set up the Omicron CMC 356 test equipment
- Run pickup and timing tests to IEC 60255-151 tolerance
- Record and verify all test results