Current Transformer Testing

Ratio · Polarity · Excitation & Knee-Point · Burden

0/5 steps · 0%

Curated study · fixed values

Mission Brief

Prove the Eyes Before You Trust the Brain

A new 138 kV feeder bay is nearly ready to energize. Before the protection relay can be trusted, the CTs that feed it must be proven — a swapped polarity or a core that saturates too early makes even a perfect relay lie. Your job: run the full CT test card on the analyzer, read the excitation curve, and either clear the CT for service or condemn it.

  • Verify turns ratio and polarity (S1/S2) of a protection CT
  • Measure the excitation curve and derive the knee-point (IEC 10%/50%)
  • Check the knee against the value the application requires (no early saturation)
  • Confirm secondary winding resistance and connected burden
  • Issue a pass/fail CT test record