Curated study · fixed values
Mission Brief
Prove the Eyes Before You Trust the Brain
A new 138 kV feeder bay is nearly ready to energize. Before the protection relay can be trusted, the CTs that feed it must be proven — a swapped polarity or a core that saturates too early makes even a perfect relay lie. Your job: run the full CT test card on the analyzer, read the excitation curve, and either clear the CT for service or condemn it.
- Verify turns ratio and polarity (S1/S2) of a protection CT
- Measure the excitation curve and derive the knee-point (IEC 10%/50%)
- Check the knee against the value the application requires (no early saturation)
- Confirm secondary winding resistance and connected burden
- Issue a pass/fail CT test record